- Labor costs are reduced by 50%+
One heavy-duty AGV can replace 2-3 workers, saving labor costs and avoiding the risk of labor fluctuations.
- 24-hour continuous operation, 30% efficiency improvement
Uninterrupted operation, the average daily effective operation time exceeds 22 hours, compared with the manual three-shift mode, the handling efficiency is improved by 30%+, and the production rhythm is accelerated.
- Accident losses are reduced by 80%
With precise navigation and obstacle avoidance, the collision rate is close to 0. Compared with traditional forklift handling, the annual average equipment/material loss caused by accidents can be reduced by more than 200,000 yuan.
- Storage space utilization is optimized by 30%
The path planning is accurate, supporting narrow channel operations with the narrowest channel less than 1.2m, reducing the invalid yard area, and accommodating 15%-30% more materials under the same storage area.
- Short investment payback period
According to enterprise cases, the investment payback period of heavy-duty AGV (load 1-50 tons) in heavy manufacturing scenarios is about 1.5-2 years to recover the cost, and the long-term comprehensive cost reduction is 25%-40%.